How Long Does It Take from Start to Finish? A Small Kitchen Remodel Timeline
Ready to give your kitchen an updated look but unsure where to start? Understanding the timeline for a small kitchen remodel can help you properly plan and budget for your upcoming project.
With some handy tips to stay on schedule, you can make the process as quick and painless as possible.
Planning Out Your Kitchen Remodel Timeline
The planning phase is the first critical step in your kitchen remodel journey. This involves finalizing the design, selecting materials and fixtures, obtaining permits, and preparing for demolition.

For a minor remodel, expect the planning stage to take 2-4 weeks. This allows sufficient time for creating floor plans, ordering cabinets and appliances, and getting approvals for any structural changes. Rushing this stage can cause delays and headaches down the road.
Key Planning Stage Tasks
- Finalizing the kitchen layout and design
- Selecting cabinets, countertops, flooring and hardware
- Ordering appliances and custom fabricated items
- Obtaining required building permits
- Demolition preparation - disconnecting utilities, equipment rental
Demolition: Out With the Old
Now that the design and materials are ready, it's time for demolition. This involves removing existing cabinets, countertops, sinks, and appliances to clear the space for new installation.
Expect the demolition phase to take 1-2 days depending on the size and scope. Safety is paramount, so be sure to disconnect water lines and electricity to avoid hazards.
Demolition Stage Tasks
- Removing old cabinets and countertops
- Taking up existing flooring if being replaced
- Knocking down walls if layout changes
- Capping plumbing and electrical connections
- Clearing debris and preparing the raw space
Installation: Rebuilding Your New Kitchen
This is the longest stage of the remodel, involving several weeks of intensive installation work. With demolition completed, it's time to rebuild your kitchen components.
Expect the installation phase to take 3-6 weeks depending on size. Careful project management is key here to keep things moving briskly.
Key Installation Tasks
- Installing new electrical, plumbing, HVAC
- Framing new walls, adding insulation and drywall
- Laying the subflooring and new flooring
- Hanging new cabinets and fastening countertops
- Connecting reinstalled or new sink, appliances
Countertops and Finishing Touches
The finishing touches involve adding those final decorative elements and verifying quality. Countertop fabrication and installation is a key task, taking 1-2 weeks including templating and bonding time. The completion timeline also accommodates any minor repairs, touch ups, and quality checks before final sign off.
Finishing Stage Tasks
- Fabricating and installing natural stone or quartz countertops
- Tiling the backsplash
- Installing hardware like pulls, knobs, and lighting
- Painting and trim work
- Addressing any finishing repairs and punch list tasks
Inspection and Sign Off
The final step is project closeout and inspection. Expect this to take 1-3 days. The contractor will verify all work is complete and meets quality standards. You'll do a final walkthrough of your renovated kitchen and sign off on the project.
Project Completion Tasks
- Contractor QC inspection and corrections
- Homeowner final walkthrough
- Obtaining certificate of occupancy
- Signing completion forms and releasing payment
Timeline Disruptions to Avoid
While every remodel involves some curveballs, staying aware of a few common snags can help you avoid major delays:
- Custom cabinets and countertops extend lead times
- Appliance shortages create delivery gaps
- Material backorders and shipping delays
- Permit approval hiccups
- Contractor scheduling conflicts
Building some buffer into your timeline, ordering early, and confirming timelines from all vendors can keep your remodel on track.
Tips for Expediting Your Remodel
Want to shorten your remodel time frame? Here are some key strategies:
- Use ready-to-assemble stock cabinets for faster installation
- Select in-stock countertop materials versus natural stone
- Order appliances and fixtures 4-6 weeks in advance
- Shop clearance and sales for prompt stock availability
- Get permits as early as possible
- Minimize mid-project changes and additions
Minor kitchen remodels typically span 8-12 weeks from start to finish. Understanding what each project phase entails helps set clear expectations. With careful planning and coordination, you can minimize headaches and delays during your renovation journey.
The key is focusing on quality over speed. Rushing through demolition and installation is a recipe for mistakes, safety hazards, and shoddy workmanship. Invest the time upfront in design, materials selection and contractor vetting. Build in some buffer room in your timeline. And get ready to enjoy the final result - your refreshed, revitalized dream kitchen!